Kushida Shrine Station East Construction Zone, Nanakuma Line
Outline
- Client
- Fukuoka City Transportation Bureau
- Location
- Hakata-ku, Fukuoka City
- Completion
- 2021.07
- Work Summary
- Total Length 469.6m (Shield Method 426.1m, Open Cut Method 43.5m)
Mud Pressure Balanced Shield Method 852m (In-bound Line 423m, Out-bound Line 429m)
Outer Diameter of Shield Machine 5,440mm