Recovery of coast, Ryoishi port
Outline
- Client
- Iwate prefecture
- Location
- Kamaishi city, Iwate
- Completion
- 2018.07
- Work Summary
- 186 Steel Pipe Piles: φ1,500 t=15~25mm L=22.5~26.5m
Precast Coating: 3,134m2
Packed Concrete Coating: 1,173m3
Removal of Exisiting Seawalls: 486m3