Keihan Nakanoshima Line Second Construction Zone

    Civil engineering Kinki Railway Facilities 2006~2010
京阪電鉄中之島線 第2工区
京阪電鉄中之島線 第2工区
京阪電鉄中之島線 第2工区

Outline

Client
Nakanoshima Rapid Railway Co., Ltd.
Location
Kitaku Nakanoshima,Osaka
Completion
2009.08
Work Summary
・Total Length 536m
・Open Cut Method
 Total Length 245m
 Excavation 58,036m3
 Framework Concrete 16,329m3
・Mud Pressure Balanced Shiled Method
 Outer Diameter 6,950mm
 Total Driving Length 581.5m
  -Single Shield Machine was turned back from end point
・Ground Improvement(High Pressure Injection Stirrer, Chemical Injection)

Other Works Other Works