Kisogawa Bridge (Twinkle), Shin-tomei Expressway
Outline
- Client
- Japan Highway Public Corporation Nagoya Construction Department
- Location
- Kuwana District, Mie Prefecture
- Completion
- 2001.06
- Work Summary
- 5 spans Continuous PC & Steel Composite Extra Dosed Bridge
Bridge Length 625m (Total length=1,145m)
Width 14m×2
Bridge area 18,250m2
This bridge is the world's first Continuous PC & Steel Composite Extra Dosed Bridge.