JP / EN

Works

Kisogawa Bridge (Twinkle), Shin-tomei Expressway

    Civil engineering Chubu Road 2001~2005
新東名高速道路 木曽川橋(トゥインクル)

Outline

Client
Japan Highway Public Corporation Nagoya Construction Department
Location
Kuwana District, Mie Prefecture
Completion
2001.06
Work Summary
5 spans Continuous PC & Steel Composite Extra Dosed Bridge
Bridge Length 625m (Total length=1,145m)
Width 14m×2
Bridge area 18,250m2
This bridge is the world's first Continuous PC & Steel Composite Extra Dosed Bridge.

Other Works Other Works